On Going Projects
# | TItle | Description | Client |
---|---|---|---|
1 | FM-200 System | Design,Supply of material, Installation, Guarantee,Testing & Commissioning. | Saudi Bin Ladin Group |
2 | FM-200 System | FM-200 Fire Protection System; Supply of material, Installation,Testing & Commissioning. | Convergent Technology |
3 | FM-200 System | Supply of material , Installation, Testing & Commissioning. | ETA Star |
4 | Novec-1230 | Supply of material and installation. | Ibn-e-Sina(Sabic) |
5 | FM-200 System & Fire Alarm System | Supply of material,installation,Testing & Commissioning | ISCOSA |
6 | Novec-1230 System | Engineering, Design, Supply,Installation, Testing & Commissioning Like Pipes,Fitting support, and Cable. Conduit,boxes, Back Boxes and Labor Charges. | Gulf Gaihab Int. |
7 | Co2Fire Suppression System | Engineering, Design, Supply,Installation, Testing & Commissioning For Co2 Fire Suppression System,Fire Alarm & Fire Extinguishers. | Al-Gihaz |
8 | Co2Fire Suppression System | Engineering, Design, Supply,Installation, Testing & Commissioning For Co2 Fire Suppression System,Fire Alarm & Fire Extinguishers. | Al-Gihaz |
9 | KJO-Transfer Function of SWGH | Supply of material for Fire fighting Equipments,Fire Alarm Detection System & Supply of material Engineering, Installation, Testing & Commissioning For FM-200 Fire Suppression System | JGC |
10 | Sprinkler System | Supply,Enigeering Supply of material,installation,Testing & Commissioning. | Zener |
11 | Foam Fire Protection System | Supply of material,installation,Testing & Commissioning For Parcel KAFD(4.10.4.11).Riyadh | Sterling and Wilson |
12 | Co2 Fire System | Co2 System, Supply of Material. | Al-Nafie Steel |